MetandumFREE TOOLS. NO SUBSCRIPTION.Find a calculator ⌕My projects
MEASUREMENTS AND PURCHASE DECISIONS

Compare complete supplier baskets.

Why can the cheapest quote on each item fail to give the cheapest delivered basket?

Use the matching calculator

Use this decision sequence

  1. Use equivalent specified items and already-rounded purchase quantities.
  2. Enter a quote for every item from each supplier.
  3. Add each supplier’s basket delivery charge once.
  4. Compare whole baskets before considering a split order with additional deliveries.

Keep the quantities distinct

Quantity or assumptionHow to use it
Per-item winnerIgnores the deliveries caused by splitting.
Whole basketAdds one quoted basket delivery for each supplier.
Unknown quoteMust stay missing rather than become a free item.

Worked comparison

Ten units at $10 and five units at $20 cost $200 from A; $20 delivery gives $220. The same quantities at $12 and $15 cost $195 from B; $30 delivery gives $225. Supplier A’s delivered basket is $5 lower.

Check before using the estimate

Equivalent price comparisons assume you have already checked product compatibility.

All dimensions, product properties, prices and specifications in this example are illustrative arithmetic inputs. Use the values from your measured plan, selected product data sheet and supplier quote. This guide does not choose construction specifications or certify safety.

Calculation and scope checked 2026-10-04. Methods and scope.

Related decisions

Connected work guides and comparisons

Browse all work types

Collect your material inputs

Browse material preparation sheets

Evaluate your own supplied alternatives

Browse quantity scenarios