MetandumFREE TOOLS. NO SUBSCRIPTION.Find a calculator ⌕My projects
FIND THE QUANTITY ERROR

Filter a batch’s stated use date before counting stock as available.

Can the full stock total cover a phase if some batches are not eligible on its use date?

Use the matching calculator

Use this decision sequence

  1. Use one compatible product and quantity basis for all batches.
  2. Enter each batch’s supplied last eligible use day.
  3. Remove batches ending before the planned phase use day.
  4. Allocate eligible stock by earliest expiry and report the remaining shortage separately.

Keep the quantities distinct

Quantity or assumptionHow to use it
Total recorded stockCan include batches outside their stated use date.
Eligible stockMeets the entered date rule, subject to actual condition.
Expiry-day stockIncluded under this explicit arithmetic model.

Worked comparison

An illustrative phase on day 5 requires 10 compatible units. Eight units have last eligible day 4 and six units last eligible day 10. Recorded total is 14, but only six are eligible for the stated phase; shortage is four. The excluded eight are not certified unusable by arithmetic—their actual product instruction and storage record control that determination.

Check before using the estimate

The tool cannot certify shelf life, storage conditions or material condition; enter verified eligibility limits.

All dimensions, product properties, prices and specifications in this example are illustrative arithmetic inputs. Use the values from your measured plan, selected product data sheet and supplier quote. This guide does not choose construction specifications or certify safety.

Calculation and scope checked 2026-10-04. Methods and scope.

Related decisions

Connected work guides and comparisons

Browse all work types

Collect your material inputs

Browse material preparation sheets

Evaluate your own supplied alternatives

Browse quantity scenarios