MetandumFREE TOOLS. NO SUBSCRIPTION.Find a calculator ⌕My projects
MEASUREMENTS AND PURCHASE DECISIONS

Separate gutter stock and fitting schedules.

Which fittings can be inferred from straight stock joins and which must be supplied?

Use the matching calculator

Use this decision sequence

  1. List each separate measured straight run.
  2. Round each run to usable stock lengths.
  3. Count straight joins as stock lengths minus one for that run.
  4. Enter corners, outlets and end caps explicitly from the chosen layout.

Keep the quantities distinct

Quantity or assumptionHow to use it
Straight joinsCan be counted from the stock segmentation.
Corners and outletsCome from the supplied layout.
Capacity and fallRequire information outside a purchase count.

Worked comparison

For 7 m and 4 m runs with 3 m stock, purchases are 3 and 2 lengths. Their straight joins are 2 and 1, giving 5 stock lengths and 3 straight joiners before the supplied corner and outlet fittings.

Check before using the estimate

Do not infer downpipe capacity, fall or support spacing from run length.

All dimensions, product properties, prices and specifications in this example are illustrative arithmetic inputs. Use the values from your measured plan, selected product data sheet and supplier quote. This guide does not choose construction specifications or certify safety.

Calculation and scope checked 2026-10-04. Methods and scope.

Related decisions

Connected work guides and comparisons

Browse all work types

Collect your material inputs

Browse material preparation sheets

Evaluate your own supplied alternatives

Browse quantity scenarios