Estimate delivery waiting when trucks arrive to a single receiving operation, using arrival references and entered unload durations rather than adding unload time alone.

Delivery Slot Queue processes deliveries in entered order. Each wait is the positive gap between the previous finish and the next arrival; completion advances by the larger of finish or arrival, then unload duration.

Define the receiving sequence

List each delivery in the order the receiving area can handle it, and identify the reference-hour convention used for all arrivals. Record when the operation becomes available and the duration assigned to each unload. If deliveries can unload in parallel, use different receiving resources or model each stream separately; one queue represents a single sequential operation. Include only loads that compete for that same slot. A schedule should distinguish the truck's arrival from the time unloading begins, since arriving before an earlier load finishes can create waiting. Confirm who provided the duration and whether it includes staging or paperwork. The tool models a simplified sequence of references and durations; it cannot see site congestion, traffic delays or multiple docks unless those are reflected in the inputs.

Use arrival and unload inputs

Enter the receiving start reference and the quoted waiting price per hour, then add each delivery with its arrival reference hour and entered receiving duration. All time values must use the same hour reference, such as hours from the shift start, rather than mixing clock time with elapsed time. The queue does not infer unload duration from a load's weight or size, so use the receiver's schedule or a written carrier term. Keep exact decimals when a quote bills partial hours and follow the quote's own rounding rule outside the engine if needed. The result reports waiting duration and the finish reference for the sequence. It is not a forecast of arrival reliability or a guarantee that a carrier will follow the slot plan.

See why unload time is different

A worked example begins receiving at reference hour 7.5. The first truck arrives at 7.5 and takes 1.25 hours to unload. A second arrives at 8 and takes 0.5 hour. Because the first load is still being received, the second waits 0.75 hour; the queue finishes at reference hour 9.25. At a supplied wait rate of $45 per hour, the quoted waiting total is $33.75. Simply adding the unload durations would not produce the wait charge. These values illustrate the engine's sequential logic, not an operational promise. If the second delivery arrives after the first finish, its wait becomes zero even though its unload still contributes to the later completion reference.

Check units and reference times

Use one time origin for the start and all arrivals, and write down whether the numbers mean clock hours or elapsed hours. An arrival before the receiving start creates no wait before the operation becomes available under the model; the finish is based on the later of the preceding finish and arrival. If a carrier quote bills by a rounded interval, this calculator's hourly rate may not reproduce a minimum charge or rounding rule. Keep the result's reported time unit separate from the money total. Confirm whether the carrier's waiting period begins at gate entry, dock arrival or scheduled appointment time, and enter the agreed reference consistently. A source document should support each input rather than using an assumed arrival window.

Keep unload durations realistic

Ask the receiver or carrier for the duration basis and record whether it includes inspection, paperwork, staging, equipment changes or a break in receiving. One duration may not fit loads with different contents or handling requirements. If the estimate changes, preserve the original schedule and update only the affected row. Use an observed or quoted duration where available, but do not label a planning assumption as a confirmed service term. A queue result can help compare appointment order and staffing scenarios before committing to a wait charge. It cannot determine unloading safety, equipment capacity, dock dimensions or labor rules. Confirm those matters with the responsible operations lead and carrier. A clear assumption log helps explain why two schedules produce different waiting costs.

Separate waiting from delivery charges

The queue tool prices only waiting at the entered hourly rate. Truck trip charges, mileage, fixed fees, unloading labor and equipment may need a separate delivery budget. Use the Delivery Budget calculator with the carrier's trips, billable distance, rate and fixed charge, and keep that total separate from waiting unless the quote combines them. Check whether delivery minimums or waiting charges are billed on a different basis. Do not add a wait amount twice if the carrier's delivery quote already includes it. This distinction makes the estimate easier to reconcile with an invoice and clarifies whether a schedule change affects only waiting or changes the number of trips as well. Save both calculations with the same quote date and delivery scope.

Compare scheduling alternatives

To compare two possible receiving sequences, hold the start time, waiting rate, load durations and all other assumptions constant while changing the arrival times or order. One illustrative sequence starts at hour 8, with a first load arriving at 8 for two hours and a second arriving at 11 for one hour; the second does not wait, and receiving finishes at hour 12. The relevant delivery order matters because a late first unload can hold every following load. Use separate checks for scenarios rather than overwriting the original record. If a truck can use another dock, model that separate receiving stream instead of pretending the same queue handles parallel work. Confirm schedule feasibility with the site team and carrier.

Document the quoted result

Save the appointment list, time origin, unload source, hourly waiting rate, sequence, queue output and associated delivery quote. Confirm the carrier's billing definition for waiting, including any minimum or rounding interval, before treating the tool's amount as the invoiced total. When an arrival or duration changes, rerun the sequence and keep the previous version for comparison. The output is a planning calculation based on entered times, not a traffic forecast or a guarantee of a receiving slot. Delivery Budget separately totals trip and distance charges. Together, the records show which assumptions affect the waiting charge and which belong to the delivery price, making later invoice review more straightforward for accounting.

Questions about this guide

How much does the second delivery wait in the worked queue?

Receiving begins at hour 7.5; the first unload runs 1.25 hours, ending at 8.75. The second truck arrives at 8, so it waits 0.75 hour; at $45 per hour, the modeled waiting charge is $33.75.

Why is the waiting total not the sum of unload durations?

Unload duration advances the receiving finish, while waiting occurs only when a truck arrives before the prior unload finishes. The two durations in the example total 1.75 hours, but only the second delivery waits.

What is the result when the second load arrives at hour 11?

In the separate case, the first unload starts at 8 and finishes at 10; the second arrives at 11, so neither load waits. Receiving completes at hour 12.

When should another delivery stream be modeled separately?

If two loads can unload in parallel at different receiving resources, use a separate queue for each stream. One sequence represents a single sequential receiving operation and cannot infer multiple docks.

Use the matching calculator

Updated . Reviewed . Methods and scope.

Related decisions

Connected work guides and comparisons

Browse all work types

Collect your material inputs

Browse material preparation sheets

Evaluate your own supplied alternatives

Browse quantity scenarios