MetandumFREE TOOLS. NO SUBSCRIPTION.Find a calculator ⌕My projects
MEASUREMENTS AND PURCHASE DECISIONS

Account for resaw kerf and surfacing allowances.

Why is blank thickness divided by finished thickness an optimistic resaw yield?

Use the matching calculator

Use this decision sequence

  1. Use the measured blank thickness.
  2. Add supplied surfacing allowance to every resulting board.
  3. Include saw kerf between source cuts under the stated uniform model.
  4. Round feasible board yield down and source blanks up.

Keep the quantities distinct

Quantity or assumptionHow to use it
Finished thicknessThe useful resulting board dimension.
Surfacing allowanceAdditional material consumed per board.
Saw kerfMaterial removed by the cut.

Worked comparison

A 50 mm blank, 10 mm finished boards, 2 mm surfacing allowance per board and 3 mm kerf gives floor((50+3)/(10+2+3)) = 3 boards per blank. Ten finished boards need 4 blanks.

Check before using the estimate

This dimensional yield does not assess grain, defects, moisture movement or machine suitability.

All dimensions, product properties, prices and specifications in this example are illustrative arithmetic inputs. Use the values from your measured plan, selected product data sheet and supplier quote. This guide does not choose construction specifications or certify safety.

Calculation and scope checked 2026-10-04. Methods and scope.

Related decisions

Connected work guides and comparisons

Browse all work types

Collect your material inputs

Browse material preparation sheets

Evaluate your own supplied alternatives

Browse quantity scenarios